| Customization: | Available |
|---|---|
| After-sales Service: | Support |
| Warranty: | 1year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Product Name | SBS/APP bitumen waterproof membrane production line |
| Capacity (M2/year) | 2 million, 3 million, 5million, 10 million |
| Production line Parts |
Indoor bitumen membrane production line |
| Oxidation bitumen part | |
| Heating boiler part | |
| Environment protection part | |
Final products |
Sbs bitumen waterproof membrane |
| APP bitumen waterproof membrane | |
| Self adhesive bitumen waterproof membrane | |
| Surface: Sand, PE, Mineral, aluminum | |
| Thickness: 2mm, 3mm,4mm,5mm | |
| Fuel | Gas/Diesel/Electric/Coal |





1.Brief introduction of SBS bitumen Waterproof membrane production line
The production line is to produce bitumen waterproof membrane
Bitumen Membrane (Bituminous Membrane) is widely used in industrial and civil buildings, such
as roof, basement, toilet, bridge, park, swimming pool, tunnel for waterproof and moistureproof.
Bitumen is kind of hydrocarbon and is created naturally from crude oil. It is a useful carbon store
and does not generate greenhouse gases. The membrane is therefore a sustainable way of storing
carbon on the Earth's surface.
2. Technological process of SBS bitumen Waterproof membrane production line
Bitumen Mixed with rubber powder, talc powder. Meanwhile polymers are added to the bitumen
such as APP (atactic polypropylene) a plastic additive that gives rigidity and tear resistance or SBS
(styrene butadiene styrene) a rubber additive that gives more elastic benefits. At last it to be
covered with limestone or sand or PE film or aluminum film.
Base Material (Reinforcement) - Polyester, fiberglass, etc.
SBS bitumen Waterproof membrane production line
1)Engineers will supply overseas installation guiding service.
2)Installation will be finished within 2 months normally.
(buyer should supply enough labour help and installation tools help )
3)Trial operation will be finished within 15days normally.
(buyer should supply necessary raw materials and auxiliary tools and rooms )
4)We welcome your visit to our factory ,then,it would be our greatest pleasure to introduce every part to you face-to-face. you can choose the parts you need or delete the parts you don't need.