Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly

Still deciding? Get samples of $ !
Order Sample
Product Details
Customization: Available
After-sales Service: Support
Fast Installation: Standard Installation
Shipping
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Guarantee
Payment Methods:
T/T PayPal ApplePay GooglePay visa mastercard american express discover
JCB diners club PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (11)
  • Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
  • Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
  • Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
  • Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
  • Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
  • Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
Find Similar Products
  • Overview
  • Product Description
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
CLA-40
Material
Sandwich Panel
Performance
Damp Proofing, Durability, Fire Resistance, Sound Insulation, Waterproofing
Model No.
Cla-40
Design Style
European Style
Layout
One Bedroom, One Living Room and One Bathroom
Usage
Living
Productivity
20000
Customized or Not
Customized
Building Area
31.6m²
Form
Mspace
Transport Package
Normal Package
Specification
2.2*11.8. *2.5M
Origin
Shandong, China
HS Code
9406900090
Production Capacity
5000

Packaging & Delivery

Package Size
220.00cm * 1180.00cm * 250.00cm
Package Gross Weight
1000.000kg

Product Description

Product Description

Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
Below is the material details
main structural steel frame 80*160*2 galvanized steel pipe frame component
          wall Exterior wall metal panel with carved patterns
Wall studs: 50*50*1.2 / 30*50*1.0 / 20*40*1.0 square tubes
50mm extruded polystyrene board for wall insulation
8mm integrated wall panel for interior wall decoration
Indoor floor decoration 4mm stone-plastic flooring
indoor floor structure Floor keel: 50*100*1.2 square tubes / 40*60*1.2 square tubes
floor slab 18mm cement board
top surface structure Top keel: 40*80*1.2 mm square tubes / 50*100*1.2 mm square tubes
Top skin 0.8 galvanized anti-corrosion roof panel
top insulation Top 50mm extruded plastic board
Indoor ceiling decoration 8mm bamboo-wood fiberboard ceiling
glass 5+12A+5 double-layer tempered glass
window aluminum window with broken bridge
Entrance door aluminum alloy
feed system Cable concealed wiring: 42 for air conditioning, 2.52 for power outlets, 1.52 for lighting, and 2 for distribution boxes.
Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly
Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyPrefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly

Certifications

Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After Assembly

FAQ

Prefabricated Mobile Container Cabin Factory Prefab Finish Ready to Use After AssemblyCAMPER TRAILER GUIDE
1. When parking the car, you need to support the parking jack before getting on the car; 2. When the temperature is below zero in winter, the water heater, water tank, and water pipes need to be drained;
3. When the amount of water in the water tank is insufficient, the power supply of the water pump needs to be turned off, and do not run idly;
4. When driving, the positioning pin lock must be locked and the safety rope must be tied to prevent the danger of unhooking;
5. Please turn off the main power when the vehicle is not in use;
6. It is forbidden to bring people in the RV when driving, so as to avoid danger;
7. Please keep the tire pressure between 3.8-4.3 kg;
8. Before driving, make sure that the traction device of the vehicle in front is safe and reliable;
9. If it is an optional fixed toilet RV, after using the fixed toilet, please do not throw paper towels directly into the toilet to avoid blockage;
10. When driving, lock the doors and windows and put the shower head in the bathroom below;
11. When driving continuously for a long time and long distance, you need to check the temperature of the middle axle of the tire at the service area regularly (test the temperature by hand, whichever is not hot), and the long-distance downhill section should be slow and stopped to ensure that the brake system is fully heat-dissipating.
In the case of ignoring this description, the company will not be responsible for the problems, damages and accidents caused thereby; similarly, the company will not be responsible for the problems caused by the modification, reshaping and installation of the RV without the approval of the company. Take any responsibility.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Send Inquiry
Chat Now